Navigation
Menu Center
-
Product category
-
News Online
-
Application scenario

Contact: Manager Han
Tel:+0086 153 8402 0670
Mail:2873282030@qq.com
Add:Room 607, Deya jinzuo, Linping street, Yuhang District, Hangzhou China
The use of hand pulled hoists for maintenance of impact crushers in cement plants
Source:China Kaitaer Official Website Release date:2025-03-21
On the cement production line, the impact crusher uses strong impact force to crush hard limestone. This equipment consists of core components such as rotor, plate hammer, and impact plate. The high-speed rotating rotor drives the plate hammer to repeatedly impact and crush the material. Its high crushing ratio and low energy consumption make it a key equipment for cement raw material processing.
The maintenance work of the counterattack crusher is crucial, and the disassembly of its components tests the technical level of the maintenance personnel. At this point, the chain hoist becomes a capable assistant. This traditional lifting tool plays an important role in equipment maintenance due to its reliable load-bearing performance and precise control capability. Maintenance personnel can easily lift components such as rotors and plate hammers weighing several tons smoothly for maintenance or replacement.
The combination of chain block and impact crusher demonstrates the perfect integration of traditional tools and modern equipment. The chain hoist is made of high-quality alloy steel and undergoes special heat treatment, which has excellent wear resistance and fatigue resistance. Its unique braking system ensures absolute safety when hovering heavy objects, making maintenance work more relaxed. This durable tool still holds an irreplaceable position in modern cement plants.
In the symphony of cement production, the counterattack crusher plays a symphony of power, while the chain hoist plays a reliable guarantor. The tacit cooperation between the two ensures the stable operation of the cement production line and also interprets the art of industrial equipment maintenance.
- Last: Installation of water pump and turbine for hydropower statio
- Next: 没有了